141kva prime power package

2023 Norwich, UK

Our customer approached us requiring a Prime power system to be active 24/7 to assist a construction project for approximately 1 year, Diesel Power provided a brand new, top of the range JCB G141QS generator paired with a 2000 litre bulk fuel tank with complete fuel management for the duration of the project. Our customer also benefited from 24/7 remote generator monitoring, Delivery and installation.

Generator was active for 416 days, running 24/7 with ZERO faults/breakdowns

Servicing was completed "out of hours" to minimise disruption on site. 


Full turn key power solution

85kva Offshore Generator Overhaul

Southern North Sea, UK

Our valued Oil and Gas customer approached us with a total overhaul project for a platform prime power 85kva generator set, This job was completed in our workshop repair facility located in Great Yarmouth, This project involved a total nut and bolt overhaul with all parts either replaced or rebuilt.

Once overhaul was complete a full F.A.T test was carried out at our workshop facility located in Great Yarmouth.

The Generator set was then shipped back offshore for recommissioning and synchronisation 